NOTICIAS

Inicio / What tools and materials are needed for installing the main structure materials of the clean shelter?
Centro de información
Elija sus visitas especiales
Solución
Productos recomendados
Últimas noticias
Póngase en contacto con nosotros
What tools and materials are needed for installing the main structure materials of the clean shelter?

Below is a list of the most commonly used and essential tools and materials for installing the main structure of the clean room (generally made of aluminum profiles / square steel / corrugated sheet), which can be directly used for construction, procurement, or scheme writing.
I. Common Materials for the Main Structure
The main structures of the clean room are usually three types:
Industrial aluminum profiles (most commonly used, easy to disassemble, high cleanliness)
Galvanized square tubes / square steel (strong load-bearing, low cost)
Stainless steel frame (high cleanliness, corrosion-resistant)
The following are common tools and materials.
II. Essential Installation Tools
1. Measuring and Laying Tools
Laser level / level
Steel tape measure, right-angle ruler, ink roller
Marker pen, chalk
2. Cutting and Processing Tools
Profile cutting machine (for aluminum profiles only)
Hand drill, impact drill
Angle grinder (for grinding, deburring)
Drilling tool, drill bit set
3. Fastening Installation Tools
Hex key wrench set (for aluminum profiles only)
Adjustable wrench, socket wrench
Rubber hammer, rubber mallet
Screwdriver (cross / flat head)
Level, straightedge
4. Auxiliary Tools
Ladder, scaffolding
Gloves, safety goggles, mask
Cables, wiring board
III. Installation Materials for the Main Structure
1. Main Frame Materials
Industrial aluminum profiles (4040/4080/5050 etc.)
Or galvanized square steel, stainless steel square steel
2. Connecting Parts (Essential for Aluminum Profiles Structure)
Angles, angle brackets
Built-in connecting parts, elastic nuts
Screws, flat washers, spring washers
End caps, sealing caps
3. Fixing and Sealing Materials
Expansion bolts (for fixing the ground)
Self-tapping screws, drill tail screws
Structural glue, sealant (neutral silicone sealant)
Foam strips, sealing strips
4. Surrounding and Roofing Matching Materials
Handmade / machine-made clean sheet metal
Aluminum profile edge strips, pressure strips
Door materials, window materials, arc-shaped aluminum profiles
IV. Brief Installation Process (for your scheme writing convenience)
Site measurement and positioning
Ground expansion bolt fixation of the base
Column installation, vertical adjustment
Crossbeam and longitudinal beam assembly
Overall correction and tightening of the frame
Clean sheet metal enclosure, roof installation
Sealing and gluing, cleaning and finishing

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *

Compartir a...