{"id":5640,"date":"2026-07-21T09:47:59","date_gmt":"2026-07-21T01:47:59","guid":{"rendered":"https:\/\/www.bacintl.com\/?p=5640"},"modified":"2026-07-21T08:39:30","modified_gmt":"2026-07-21T00:39:30","slug":"what-is-the-frequency-of-review-and-verification-for-the-operation-inspection-record-sheet-of-the-negative-pressure-weighing-chamber","status":"publish","type":"post","link":"https:\/\/www.bacintl.com\/fr\/what-is-the-frequency-of-review-and-verification-for-the-operation-inspection-record-sheet-of-the-negative-pressure-weighing-chamber\/","title":{"rendered":"What is the frequency of review and verification for the operation inspection record sheet of the negative pressure weighing chamber?"},"content":{"rendered":"<p>Negative pressure weighing room operation inspection record form &#8211; Recheck verification frequency (GMP compliance stratified standard)<br \/>\nI. First-level recheck: Operator self-inspection (every shift, immediate)<br \/>\nFrequency: After filling out the inspection record form, the operator must immediately self-check. This is a mandatory pre-process that cannot be submitted for review without completing the self-check. Scenario: At the end of each shift, the operator fills out the form and conducts on-site self-check immediately, confirming that there are no blank items, the data is correct, and the signature is complete.<br \/>\nII. Second-level recheck: Shift supervisor on-site recheck (every shift, before the end of the shift)<br \/>\nFrequency: Once per shift. All inspection records must be rechecked on-site on the same day. Cross-shift and cross-day rechecks are not allowed.<br \/>\nRequirements: Take the paper record to the weighing room for on-site comparison with the instrument and equipment status, and sign and return it after verification.<br \/>\nIII. Third-level recheck: QA \/ Equipment administrator random recheck (parallel two frequencies)<br \/>\n1. Daily surprise recheck (daily supervision)<br \/>\nFrequency: Full coverage recheck every day. If there are multiple weighing rooms in the workshop, at least one recheck per day should be conducted; the monthly recheck should cover all shift records of all negative pressure weighing rooms in the workshop.<br \/>\nForm: Random on-site remeasurement of parameters, comparing the authenticity of the paper records for the day.<br \/>\n2. Monthly ledger comprehensive recheck (periodic ledger review)<br \/>\nFrequency: Once per month. After the completion of the entire inspection ledger for the month, QA \/ Equipment administrator should conduct a comprehensive recheck and verification of each ledger.<br \/>\nWork content:<br \/>\nVerify the continuity of the entire month&#8217;s records, check for missing pages, pre-filled, or proxy signatures;<br \/>\nCross-link verification: Logical matching of inspection abnormal records, maintenance work orders, filter replacement records, and instrument calibration records;<br \/>\nCount the defects in the monthly records and form monthly training and rectification items.<br \/>\nIV. Annual recheck: Comprehensive review before audit (once a year)<br \/>\nFrequency: Before the GMP revalidation \/ drug regulatory audit of the previous year, conduct a complete recheck and verification of all inspection records.<br \/>\nFunction: Sort out the defects and deviation closed-loop situations throughout the year, and form a summary report on equipment record management.<br \/>\nSummary concise version (can be directly written into SOP)<br \/>\nOperator self-check: Every shift immediately;<br \/>\nShift supervisor on-site recheck: Once before the end of the shift;<br \/>\nQA daily random check: Randomly selected every day, full coverage of all equipment every week;<br \/>\nMonthly ledger comprehensive recheck: Once at the end of the month;<br \/>\nAnnual archiving review and recheck: Once a year.<br \/>\nAdd special scenario recheck requirements<br \/>\nIn case of equipment failure, parameter exceedance, or deviation events: Additional special recheck, no fixed frequency, simultaneously verify all inspection records within the previous 3 days of the incident;<br \/>\nFor new employees starting work independently 3 days before: Shift supervisor double recheck, each shift conduct secondary verification twice.<\/p>","protected":false},"excerpt":{"rendered":"<p>Negative pressure weighing room operation inspection record form &#8211; Recheck verification frequency (GMP compliance stratified standard) I. First-level recheck: Operator self-inspection (every shift, immediate) Frequency: After filling out the inspection record form, the operator must immediately self-check. This is a mandatory pre-process that cannot be submitted for review without completing the self-check. Scenario: At the [&hellip;]<\/p>","protected":false},"author":12,"featured_media":5246,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[92],"tags":[],"class_list":["post-5640","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-technology"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/posts\/5640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/comments?post=5640"}],"version-history":[{"count":1,"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/posts\/5640\/revisions"}],"predecessor-version":[{"id":5641,"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/posts\/5640\/revisions\/5641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/media\/5246"}],"wp:attachment":[{"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/media?parent=5640"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/categories?post=5640"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bacintl.com\/fr\/wp-json\/wp\/v2\/tags?post=5640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}