{"id":5310,"date":"2026-04-16T08:51:23","date_gmt":"2026-04-16T00:51:23","guid":{"rendered":"https:\/\/www.bacintl.com\/?p=5310"},"modified":"2026-04-16T08:29:35","modified_gmt":"2026-04-16T00:29:35","slug":"what-are-the-specific-steps-for-installing-the-main-structure","status":"publish","type":"post","link":"https:\/\/www.bacintl.com\/es\/what-are-the-specific-steps-for-installing-the-main-structure\/","title":{"rendered":"What are the specific steps for installing the main structure?"},"content":{"rendered":"<p>Main structure installation steps of the clean room (general standard version)<br \/>\nI. Preparations<br \/>\nSite cleaning: The ground should be clean, free of debris and water accumulation.<br \/>\nLaying out and positioning:<br \/>\nUse a tachymeter \/ laser level to mark the positions of the columns.<br \/>\nDetermine the length and width of the clean room, the direction of entry and exit, and the layout of the FFU.<br \/>\nMaterial inspection:<br \/>\nAll the materials, such as profiles, angle pieces, screws, anchor bolts, and expansion bolts, should be complete and undamaged.<br \/>\nII. Formal installation steps<br \/>\n1. Install the anchor base<br \/>\nDrill holes at the marked points of the columns \u2192 Insert expansion bolts \u2192 Fix the anchor base.<br \/>\nLevel the base to ensure that all bases are of the same height and level.<br \/>\n2. Assemble the bottom frame<br \/>\nConnect the bottom cross and longitudinal aluminum profiles with angle pieces.<br \/>\nPlace it on the anchor base, initially lock it, do not tighten it completely, to facilitate subsequent adjustments.<br \/>\nUse a laser level to check:<br \/>\nSquare (equal diagonals)<br \/>\nLevel (uniform height around)<br \/>\n3. Install the columns<br \/>\nConnect the columns with the corner pieces of the bottom frame, stand them vertically.<br \/>\nCheck the verticality with a level, deviation \u2264 2mm\/m.<br \/>\nFully tighten the screws of the columns and the bottom frame.<br \/>\n4. Install the top frame<br \/>\nInstall the top beams and cross beams to form a rectangular top frame.<br \/>\nCheck:<br \/>\nSquare (top)<br \/>\nOverall vertical without inclination<br \/>\nConfirm that there are no errors, then fully tighten all the angle pieces and screws.<br \/>\n5. Reinforcement and leveling<br \/>\nAfter the overall frame is completed, recheck:<br \/>\nLevel<br \/>\nVertical<br \/>\nSquare<br \/>\nUse leveling spacers to fine-tune if there are deviations.<br \/>\nFinally, tighten all the anchor bolts of the expansion screws.<br \/>\n6. Install the top FFU \/ blind plate keel (if any)<br \/>\nInstall the FFU cross beams on the top frame.<br \/>\nArrange the spacing according to the FFU size to ensure uniform load-bearing.<br \/>\n7. Install the enclosure structure (sides)<br \/>\nInstall according to the material you choose:<br \/>\nPVC curtain: Install the hanging rail \u2192 Hang the curtain \u2192 Adjust the height.<br \/>\nAcrylic \/ PC board: Fix with angle aluminum strips \u2192 Seal with glue.<br \/>\nTempered glass \/ color steel plate: Seal with glue \u2192 Fix the strips \u2192 Seal the edges.<br \/>\n8. Sealing and cleanliness treatment<br \/>\nApply neutral clean sealant to all the joints of the columns, cross beams, and the ground.<br \/>\nRemove burrs and sharp corners to avoid dust accumulation.<br \/>\nClean the site to ensure no dust or waste.<br \/>\nIII. Key points for installation completion and acceptance<br \/>\nThe frame is firmly installed without shaking.<br \/>\nThe levelness, verticality, and squareness meet the standards.<br \/>\nAll screws are fully tightened without loosening.<br \/>\nThe sealant is continuous, without bubbles or cracks.<br \/>\nThe overall does not produce dust and is easy to clean, meeting the requirements of the clean area.<\/p>","protected":false},"excerpt":{"rendered":"<p>Main structure installation steps of the clean room (general standard version) I. Preparations Site cleaning: The ground should be clean, free of debris and water accumulation. Laying out and positioning: Use a tachymeter \/ laser level to mark the positions of the columns. Determine the length and width of the clean room, the direction of [&hellip;]<\/p>","protected":false},"author":3,"featured_media":4933,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[92],"tags":[],"class_list":["post-5310","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-technology"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts\/5310","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/comments?post=5310"}],"version-history":[{"count":1,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts\/5310\/revisions"}],"predecessor-version":[{"id":5311,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts\/5310\/revisions\/5311"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/media\/4933"}],"wp:attachment":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/media?parent=5310"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/categories?post=5310"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/tags?post=5310"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}