{"id":5250,"date":"2026-03-30T14:49:19","date_gmt":"2026-03-30T06:49:19","guid":{"rendered":"https:\/\/www.bacintl.com\/?p=5250"},"modified":"2026-03-30T08:25:49","modified_gmt":"2026-03-30T00:25:49","slug":"how-to-maintain-and-service-the-negative-pressure-weighing-room","status":"publish","type":"post","link":"https:\/\/www.bacintl.com\/es\/how-to-maintain-and-service-the-negative-pressure-weighing-room\/","title":{"rendered":"How to maintain and service the negative pressure weighing room?"},"content":{"rendered":"<p>Negative pressure weighing room comprehensive maintenance (GMP compliant version, easy to understand and implement)<br \/>\n1. Daily inspection (must be done every shift \/ every day)<br \/>\nAppearance and cleanliness<br \/>\nNo dust or accumulated materials on the inner walls, workbench, return air filter, operation port; wipe with dust-free cloth + purified water \/ 75% ethanol, prohibit corrosion of the cabinet by strong acids and strong alkalis.<br \/>\nParameter confirmation<br \/>\nCheck the pressure difference gauge: the indoor negative pressure is stable at **-15~-30Pa**;<br \/>\nCheck the wind speed: the vertical wind speed at the working surface is 0.35~0.45m\/s;<br \/>\nThe fan, lighting, and alarm functions are normal, without abnormal sounds or air leakage.<br \/>\nOperation norms<br \/>\nDo not knock on the HEPA high-efficiency filter, do not stack materials at the air outlet; start self-cleaning for 10~15 minutes before feeding and weighing.<br \/>\n2. Mantenimiento semanal<br \/>\nDeep cleaning: disassemble and wash the primary filter and return air filter (wash and dry with water, strictly prohibit sun exposure);<br \/>\nCheck the cabinet sealing: no cracks or air leakage at the door frame, maintenance port, and glass rubber strip;<br \/>\nCalibrate pressure difference and wind speed sensors, record the ledger.<br \/>\n3. Mantenimiento mensual<br \/>\nCheck the dust accumulation of the medium-efficiency filter, if the pressure difference increases, predict and replace in time;<br \/>\nClean the fan cavity and internal air duct, remove accumulated dust;<br \/>\nCheck the circuit, wiring, and start\/stop switch, prevent poor contact;<br \/>\nOverall disinfection: ozone \/ ultraviolet + surface wiping combined disinfection (note that ultraviolet must not shine on people or materials).<br \/>\n4. Quarterly \/ Annual Key Maintenance (Core consumables)<br \/>\n1. Filter replacement (most important)<br \/>\nPrimary filter: 1~3 months \/ water washing for reuse, 3~6 months mandatory replacement;<br \/>\nMedium-efficiency filter: 6~12 months, or replace immediately if the pressure difference exceeds the initial value by 2 times;<br \/>\nHEPA high-efficiency filter:<br \/>\nRegularly 1~2 years replacement; if high-toxicity \/ high-activity dust, shorten to 6~12 months;<br \/>\nAfter replacement, must do: leak detection (PAO leak detection) + wind speed calibration + pressure difference re-measurement, keep GMP verification records.<br \/>\n2. Fan and power part<br \/>\nEvery year check the fan bearings, belt tightness, add lubrication; adjust the variable frequency parameters in time when the air volume decreases.<br \/>\n3. Seal and structure<br \/>\nEvery year check the weld seams, tempered glass, and sealing strips of the cabinet, replace directly if aging and hardening, to prevent negative pressure leakage and dust leakage.<br \/>\n5. Prohibit illegal operation &amp; Fault emergency<br \/>\n\u274c Prohibit starting and removing the filter, prohibit blocking the return air outlet, prohibit long-term opening operation;<br \/>\n\u274c HEPA filter must not be washed with water, knocked, or wiped;<br \/>\nIn case of insufficient negative pressure \/ wind speed alarm: immediately stop feeding, seal the materials, stop the machine to check air leakage + filter blockage;<br \/>\nIf a large amount of dust spills out: stop the machine for disinfection, detect the surrounding environment dust, and investigate filter damage.<br \/>\n6. GMP Required Ledger (must be checked during acceptance)<br \/>\nDaily operation record sheet (pressure difference, wind speed, cleaning records);<br \/>\nFilter cleaning \/ replacement records, PAO leak detection report;<br \/>\nCalibration certificate, maintenance work order, fault handling record.<\/p>","protected":false},"excerpt":{"rendered":"<p>Negative pressure weighing room comprehensive maintenance (GMP compliant version, easy to understand and implement) 1. Daily inspection (must be done every shift \/ every day) Appearance and cleanliness No dust or accumulated materials on the inner walls, workbench, return air filter, operation port; wipe with dust-free cloth + purified water \/ 75% ethanol, prohibit corrosion [&hellip;]<\/p>","protected":false},"author":3,"featured_media":5245,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[92],"tags":[],"class_list":["post-5250","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-technology"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts\/5250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/comments?post=5250"}],"version-history":[{"count":1,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts\/5250\/revisions"}],"predecessor-version":[{"id":5251,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/posts\/5250\/revisions\/5251"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/media\/5245"}],"wp:attachment":[{"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/media?parent=5250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/categories?post=5250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bacintl.com\/es\/wp-json\/wp\/v2\/tags?post=5250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}