{"id":5265,"date":"2026-04-02T08:53:11","date_gmt":"2026-04-02T00:53:11","guid":{"rendered":"https:\/\/www.bacintl.com\/?p=5265"},"modified":"2026-04-02T09:22:19","modified_gmt":"2026-04-02T01:22:19","slug":"what-are-the-installation-steps-for-the-high-efficiency-air-filter-of-the-supply-air-ceiling","status":"publish","type":"post","link":"https:\/\/www.bacintl.com\/ar\/what-are-the-installation-steps-for-the-high-efficiency-air-filter-of-the-supply-air-ceiling\/","title":{"rendered":"What are the installation steps for the high-efficiency air filter of the supply air ceiling?"},"content":{"rendered":"<p>Air supply ceiling high-efficiency filter (on-site standard installation steps)<br \/>\n(Adapted for operating rooms \/ GMP cleanroom laminar air supply ceilings, can be directly handed over for construction)<br \/>\nI. Pre-installation preparation (critical, prevent later dust leakage, leak detection failure)<br \/>\nOn-site: Thoroughly vacuum the ceiling \/ ceiling static pressure box interior + wipe with dust-free cloth, no welding slag, floating dust, or debris; cover the air outlets with film protection throughout.<br \/>\nPersonnel: Wear clean clothes, gloves, and masks. Do not touch the filter material or sealing surface with bare hands.<br \/>\nInspection: Check the model H13\/H14, size, appearance; filter surface without damage, no cracking of the adhesive; record the initial resistance of the filter at the factory and file it.<br \/>\nSupplies: Sealing strips are intact and without deformation; frames and screws are complete.<br \/>\nII. Pre-installation sealing and cleaning<br \/>\nSmoothly attach the sealing strips to the pressure-bearing surface of the filter frame, without stretching, without wrinkles, without breaks.<br \/>\nAgain wipe the contact surface of the installation flange of the static pressure box to ensure it is clean and dry, without dust, oil stains.<br \/>\nIII. Positioning installation (core anti-leak section)<br \/>\nSmoothly insert the high-efficiency filter into the installation position, center alignment, and attach the sealing strips around the flange in a complete circle.<br \/>\nInstall the frame \/ tighten the screws, evenly tighten in a diagonal manner in several stages:<br \/>\nFirst, lightly tighten for fixation \u2192 then add force in stages \u2192 finally uniformly tighten;<br \/>\nDo not allow single-sided force application, violent pressing (will crack the filter material, cause local leakage).<br \/>\nCheck the entire circle of the sealing strips: no deviation, no skewing, no gaps, and the entire perimeter is tightly adhered.<br \/>\nIV. Sealing and external sealing<br \/>\nFor the gaps between the filter and the box body, as well as around the inspection ports, apply neutral sealant according to specifications, continuously and fully.<br \/>\nInstall the uniform flow plate \/ diffuser net, PTFE uniform flow membrane, lay them flat without wrinkles, and fix them firmly with snap fasteners.<br \/>\nV. Post-installation mandatory verification (not doing it is like building in vain)<br \/>\nSystemally supply air step by step, start with low-speed operation for sweeping.<br \/>\nPAO aerosol leak detection: detect the entire perimeter of the frame, adhesive, and filter material for leakage; only qualified if there is no leakage.<br \/>\nTest the uniformity of the air velocity at the outlet ports at multiple points, with deviation meeting the standards.<br \/>\nRead and record: record the initial pressure difference at installation, attach a label for archiving, and use it as the basis for future replacement.<br \/>\nVI. Prohibitions (the most common pitfall in the field)<br \/>\nDo not touch the filter paper with bare hands, poke the filter surface, or press the filter;<br \/>\nDo not use missing segments or elongated pieces to patch together the sealing strips;<br \/>\nDo not start production without leak detection;<br \/>\nDo not not record the initial resistance, and there will be no way to determine the replacement node later.<\/p>","protected":false},"excerpt":{"rendered":"<p>Air supply ceiling high-efficiency filter (on-site standard installation steps) (Adapted for operating rooms \/ GMP cleanroom laminar air supply ceilings, can be directly handed over for construction) I. Pre-installation preparation (critical, prevent later dust leakage, leak detection failure) On-site: Thoroughly vacuum the ceiling \/ ceiling static pressure box interior + wipe with dust-free cloth, no [&hellip;]<\/p>","protected":false},"author":3,"featured_media":5071,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[92],"tags":[],"class_list":["post-5265","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industry-technology"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/posts\/5265","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/comments?post=5265"}],"version-history":[{"count":1,"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/posts\/5265\/revisions"}],"predecessor-version":[{"id":5266,"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/posts\/5265\/revisions\/5266"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/media\/5071"}],"wp:attachment":[{"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/media?parent=5265"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/categories?post=5265"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bacintl.com\/ar\/wp-json\/wp\/v2\/tags?post=5265"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}